You want to review machine hours (by phase and by machine) as well
as corresponding costs associated with those machine hours. You also want
to see a profit & loss profile for the block, based on fully founded
costs.
This report provides a nice summary of productivity by phase (volume
harvested / productive hour). It also shows costs per volume for each
activity that is tracked on the load ticket.
If you track the equipment units that performed a given phase on the load
slips themselves, this report will match the machine hours with that machine's
volume so you can compare the productivity of one machine versus the other.
The selection criteria determine the date range and blocks that appear in
the report. If you run the report for multiple blocks, you will get one
panel per block.
The top portion of the report (labeled with "Activities on Block") shows
hours and cost information for those phases where the machine is tracked on the
activity tab of the load slip.
The middle portion of the report (labeled with "Activities Not on
Block") shows hours and cost information for those activities where the machine is
not tracked on the activity tab of the load slip. (If you do not track any
information on the activity tab of the load slip, all your data will appear in
this portion of the report.)
The bottom panel of the report provides a summary profit and loss
statement for the block, where the costs are based on the full found hourly
equipment rates (rather than the standard hourly equipment rates plus each
worker's actual hourly wages).
The top and middle portions of the report have the following columns:
- Eq Code: The equipment unit number (code) used on the time slip
and/or load slip for this block.
- Equip Type: The Equipment Type indicated for this equipment unit
in the equipment setup table.
- Activity: The activity used on the time slip and/or load slip for
this machine's hours (and volume).
- Hours: Hours entered on the time card for that
equipment/activity/block combination.
- Equip Rate: Full Found Hourly Equipment rate set up for this
piece of equipment. (If there was a rate increase during the life of
the block, this value will reflect the average rate used for the hours
worked on this block.).
Note #1: for users with load-based rather than hourly truck
costing, this rate will be the rate per unit expressed in the truck costing
rate setup table (e.g., per tonne or tonne-hour or distance traveled)
- Actual Cost (Sub Equipment): Costs incurred by a subcontractor for
hourly work performed with his equipment.
Note #1: if you have an employee operator running a contractor
piece of rental equipment, the employee's hourly loaded payroll costs will
be included in this column.
Note #2: for the trucking phase, this column will show the
trucking payments made to subcontractors where the payment is based on the
weight or volume of the load ticket. That is, the payment will appear
in this column even though the payment is not based on hours worked.
If the contract truck is operated by one of your employee drivers, the cost
of that employee driver will appear in this column as well, where the
system-wide loaded cost factor (setup under File | System Configuration) has
been applied as an uplift to the employee's costs.
- Fully Founded Equip Cost: Costs calculated by multiplying the hours
worked for the given machine/phase by the full-found equipment rate for that
machine.
- Actual Production: If equipment unit numbers are tracked on the
back tab of the load slip for this given phase and machine, this column will
show the volume for those tickets with this machine/phase combination.
If activities are not tracked on the load slip, this column will be blank
for the machine/phase combination. The total volume harvested on the
block will, however, appear in the phase total row.
- Prod/Hour: Actual Production (volume) for this machine/activity
combination divided by the total hours worked for the machine/activity
combination.
- Total Cost/Production: The sum of the actual Cost - Sub Equipment
and Fully Founded Equip Cost columns divided by the actual production
(volume) for that machine/activity combination.
- Total Cost/Hour: The sum of the actual Cost - Sub Equipment and
Fully Founded Equip Cost columns divided by the hours for that
machine/activity combination.
The bottom portion of the report provides a summary profit and loss report
for the block, along with a set of key statistics such as load count, total
volume, etc. The rows are as follows:
- Load Revenue: All revenue associated with revenue contracts that
are load-based.
- Other Revenue: All revenue associated with fixed fee or hourly
charge-out revenue contracts. (Note: miscellaneous income
entered with the revenue contract set to NONE will be omitted from this
report entirely.)
- Total Revenue: Sum of Load Revenue and Other Revenue.
- Cost - Own Equipment: Fully founded equipment and truck costs
taken from the "Fully Founded Equip Cost" Column in the top and middle
portion of the report.
- Cost - SubCntr Equipment: Actual costs for subcontractor equipment
taken from the Actual Cost (Sub Equipment) column in the top and middle
portion of the report. Note: if you have an
employee operator running a contractor piece of rental equipment, the
employee's hourly loaded payroll costs will be included in this amount.
- Other Contractor Costs: Payments to contractors based on production
slips plus payments to contractors based on hourly time slips where the
equipment and truck on the time slip are both set to NONE.
- Other Contr Cost (Loads): Payments to contractors that are based on load
slips, but that are not captured in the top and middle portion of the
report. For example, if you have a contract buncher whom you pay based
on the m3 from the load slips, his volume will appear in the top portion of
the report (if you track his equipment unit # on the back tab of the load
slips), but his costs will not appear above. Rather, they are captured
in this line item.
- Other Employee Costs: Employee production slip payments; employee
time slips where the equipment and truck are both NONE. Note that loaded
employee costs will be reported here.
- Other Employee Costs - Loads: Payments to employees based on the
load slips. For example, if you have an employee loaderman whom you
pay based on the tonnage of the load slips for the given block he
loaded, his volume will appear in the top portion of the report (assuming
you track his equipment on the load slip activity tab), but his costs do not
appear above. Rather, they appear in this row. They are loaded
costs where the load is based on the system-wide percentage specified in the
basic setup table.
- Miscellaneous Costs: This section of expenses will have one line item per
account code for miscellaneous employee and contractor expense entries made
in connection with this block.
- Total Cost: Sum of all Cost rows shown in the bottom portion of
the report.
- Total Profit/Loss: Total Revenue less Total Cost
- Gross Margin: Total Profit/Loss divided by Total Revenue
- Load Count: Count of the number of ticket entries. (This
count does NOT make use of the Load Count field on the load slip.)
- Tonnes: Total weight from the load ticket converted into Tonnes.
(The unit of measure used for this field is taken from the entry made on the
General tab of the File | System Configuration menu item (the entry for
"Weight Unit for Reports").
- M3: Total of the volume field from the load slip. (The unit
of measure is taken from the production unit of measure on the block setup.)
- Cruise: Value taken from the Cruise entry on the last page of the
block setup wizard.
- Hectares: Value taken from the Hectares entry on the last page of
the block setup wizard. (This field is
FLOAT_1 on the block table.)
- M3/Hectares: Ratio of M3 and Hectare fields shown above.