Pay: Contractors, by Units of Activity or Production

Steps:

  1. Set up the ContractorSelect Setup | Vendors from the Main Menu
  2. Set up the Worker. Select Setup | Workers | Worker Setup from the Main Menu. 
  3. Set up Worker Base Rate.  Select Setup | Workers | Worker Base Rates.  In this case, your pay basis will be something other than hours, such as "DAY" or "KM" or "PICK-UP ALLOWANCE."  New entries can be made into the pay basis list by a system administrator.  If you want an entry in the list that is not currently there, call a Caribou support representative for assistance.
  4. Setup the Equipment Unit (Optional). If you want to track the equipment unit that the worker is operating, you need to set up that equipment unit. Select Setup | Equipment / Trucks | Equipment | Unit Numbers.  Alternatively, you can just set the equipment unit to NONE on the worker's production activity slip.  (See Step 5 below.)

  5. Enter Production (Activity) Slip.  Select Data Entry | Production | Sub Contractors | Enter Slips.  (Note that if you are paying someone a day rate or a pick-up allowance (for example) in addition to an hourly rate, you may prefer to have a place for entering production slips directly on the time slip, rather than in this separate window.  See information on Pay Supplements for more details.)

  6. Run Vendor (Contractor) CalculatorSelect Calculators | Vendors - Full. 
  7. Review Vendor (Contractor) Statement. Select Reports Vendor Statements.  Alternatively, Select  Reports | Hourly | Vendors.

Troubleshooting Common Errors:

"[1]: Error #1002: CONTRACTOR PRODUCTION -- PAY_CONTRACT_RATE not Set up For: WORKER = [BOULANGER-V]; VENDOR = [YBOUL]; TIME_SLIP_DATE = [7/30/2005] AND PAY BASIS = [DAY]"
 

This error occurs when a valid pay rate is not found for the a production entry for a contractor for a certain date.

Things to check when this occurs:

2.    The wrong rate is applied.

Things to check when this occurs: